Project History Aerial Photos Off-Site Views Lower Site Upper Site Driveway

Note: You May Click on Any Photo to See Enlarged View

841042c-cropped.jpg (187164 bytes)
Aerial photo of main house taken March 2005

841027revA.jpg (466743 bytes)        841037revA.jpg (649568 bytes)
Other aerial photos of main house taken March 2005

off-site view from Windmill trail after development.jpg (138524 bytes)
Off-site view of Main House after development from South

panorama.jpg (584844 bytes)
Panorama View Looking North

night panorama.jpg (633120 bytes)
Night Panorama View on 4th of July Looking North

south_panorama_full.jpg (329822 bytes)
Panorama View Looking South

Driveway_S-curve_before_grading-_from_above.jpg (1287178 bytes) Driveway S-curve during grading- from above.jpg (1298940 bytes) Driveway S-curve with rebar- from above.jpg (1292326 bytes) Driveway S-curve with concrete-from above.jpg (1119237 bytes)
Upper S-curves Portion of Driveway Progress Photos- from West

main house story poles- from East.jpg (1343387 bytes) main house before foundations- from East.jpg (1401346 bytes) main house with piers- from East.jpg (1265567 bytes) main house with floor joists- from East.jpg (1258571 bytes) garage level before turret steel installed.jpg (1290033 bytes) garage level wall framing1- from North.jpg (1202363 bytes)  garage level with gutters installed- from East.jpg (1094807 bytes) front_of_house_with_windows_installed-_from_East.jpg (1008274 bytes) Stucco lath installed- from East.jpg (1007580 bytes) front of house with stucco brown coat installed- from East.jpg (851115 bytes) front of house with color coat- from East.jpg (1043567 bytes) front of house with color coat and wrought iron installed- from East.jpg (362709 bytes) front_of_house_from_turnaround_area.jpg (913442 bytes)
Upper Site  Main House Construction Progress Photos- from East

main house story poles- from West.jpg (1358774 bytes) main house with piers- from West.jpg (1201907 bytes) main house after foundations and rat proofing- from West.jpg (1112014 bytes) upper level wall framing- from West.jpg (1050827 bytes) upper level initial roof framing- from West.jpg (927107 bytes) house with gutters and skylights- from West.jpg (1085521 bytes) exterior_windows_and_doors_installed-_from_West.jpg (1046568 bytes) Stucco lath installed- from West.jpg (1178732 bytes) rear of house with stucco brown coat installed- from West.jpg (946712 bytes) rear of house from West.jpg (1897522 bytes)
Upper Site  Main House Construction Progress Photos-from West

living room from West.jpg (271828 bytes) dining room from south.jpg (1062103 bytes) family room from west.jpg (981075 bytes) kitchen from northeast.jpg (1185688 bytes) library stairs from East.jpg (1407151 bytes) office from East.jpg (1393091 bytes) master bedroom from West.jpg (280142 bytes) sitting room from northeast.jpg (957390 bytes) master closet from northwest.jpg (1228030 bytes) rec room from West.jpg (1411725 bytes) rec room stairs East.jpg (1482887 bytes) garage workshop from northeast.jpg (1480046 bytes)
Interior of Main House with furniture after move-in

Update as of 11/26/04:

bullet

Updated off-site photos taken before and after development

bullet

Exterior tile/stucco and rock retaining wall along northside completed

bullet

Tile walkway around West side of house  and rear deck tile completed

bullet

Exterior murals and decorative tile installed

bullet

Interior photos with furniture after move-in

Update as of 4/1/04:

bullet

Moved into new home on March 25th.

Updates as of 1/15/04:

bullet

No significant changes since 1/1/04 (Working off open items toward getting final building inspection)

bullet

Expected move-in date late February or early March

Updates as of 1/1/04:

bullet

Exterior stucco color coat and Saltillo tile installed

bullet

Master bath tile and trim installed

bullet

Interior wrought iron railings and dining room cabinets installed

bullet

Laundry room, guest bathroom, and powder room tile and trim installed

bullet

Mud room tile and trim installed, as well as kitchen cabinets, tile, and appliances installed

Updates as of 12/15/03:

bullet

Stucco color coat installed on front and side of house

bullet

Stucco color coat installed on rear of house, garage deck tile and railing, and entry gates installed

bullet

Living room sconces installed

bullet

Master bath tile installed

bullet

Mud room and guest bath tile installed

bullet

Laundry tile and master closet hardwood installed

Updates as of 12/1/03:

bullet

Eave molding and Deck Saltillo tile installed

bullet

Front step handrails installed

bullet

Mud room and guest bathroom tile installed

bullet

Powder room tile installed and master bedroom wall sconces installed

Updates as of 11/15/03:

bullet

Aerial photo of upper site taken November 2003

bullet

Turnaround and garage doors installed

bullet

Interior paint and texture completed (library area and office)

bullet

Interior paint and texture completed (sitting room and living room) and kitchen cabinets installed

Updates as of 11/1/03:

bullet

Stucco brown coat installed- from North

bullet

Stucco brown coat installed- from West, Northeast, and East

bullet

Mural board, front door and front deck wrought iron installed

bullet

Carport wrought iron installed

bullet

Living room, kitchen, and family room drywall installed

bullet

Master bedroom, sitting room, and master bath drywall installed

bullet

Office and guest bedroom drywall installed

bullet

Guest wing hallway drywall installed

Updates as of 10/15/03:

bullet

Insulation installed in Master Bathroom

bullet

Insulation installed in Living Room and Drywall installed in Master Bedroom and Guest Bedroom

bullet

Drywall installed in Attic Room and Guest Bedroom wing hallway

bullet

Stucco scratch coat installed- from West

bullet

Stucco scratch coat installed- from North and South

Updates as of 10/1/03:

bullet

Existing asphalt roadway to upper site repaved and stucco lath installed from East

bullet

Stucco lath installed- from North, South, and West

bullet

Stucco lath installed on living room, garage deck, and from Northeast

bullet

Pump station retaining wall backfilled and front steps concrete poured

Updates as of 9/15/03:

bullet

Front landscape wall concrete poured, underground propane tank installed, and turret window waterproofing installed

bullet

Interior doors stained, front door surround and door ready to be installed

bullet

Master bath shower stall waterproofed

Updates as of 9/1/03:

bullet

Garage deck waterproofed, backup generator pad rebar/forms installed and underground propane tank excavation completed

bullet

Master bath shower stall waterproofed and  tub surround built, guest bath tub installed

bullet

Interior doors installed

Updates as of 8/15/03

bullet

Spanish tile loaded on roof and front entry steps formed with rebar, ready to pour concrete

bullet

Exterior windows waterproofed

Updates as of 8/1/03:

bullet

Remaining exterior windows and doors installed

bullet

Roof sheeting, vents, and skylights installed

bullet

Low voltage wiring smurf tubing installed

Updates as of 7/15/03:

bullet

Exterior windows and doors installed

bullet

Entry tower ceiling stained and Turret windows installed

bullet

Office, Master Bath, and Guest Bedroom windows and doors installed

bullet

Living Room, Kitchen, and Turret windows installed

bullet

Rec Room windows and radiant heating coils installed

Updates as of 7/1/03:

bullet

Pump station storage tank/retaining walls and front entry step piers installed

bullet

Rear covered patio ceiling stained

bullet

Living room ceiling stained and house electrical and plumbing roughed in

bullet

First exterior window installed in master closet

Updates as of 6/15/03:

bullet

Front entry steps regraded- from North

bullet

Living room trusses and fireplace, master bath shower framed out

bullet

Plumbing rough-in completed

Updates as of 6/1/03:

bullet

Skylights and Gutters installed- from Exterior

bullet

Front covered porch and entry tower- from North

bullet

Skylights Installed- from Interior

bullet

Family room fireplace mantel rebuilt

bullet

Living room rafters installed and carved truss beams ready to install

Updates as of 5/15/03:

bullet

Entry tower ceiling framing and windows installed

bullet

Rear covered patio and hallway framing completed

bullet

Dining room, family room, and kitchen framing completed

bullet

Guest bedroom, guest bathroom, and Rec room framing completed

bullet

Office, master bedroom, and sitting room framing completed

bullet

Master bathroom and attic framing completed

Updates as of 5/1/03:

bullet

Garage level wall and window framing completed

bullet

Garage roof skirt and carport framing completed

bullet

Roof sheeting completed

bullet

Kitchen and hallway framing completed

bullet

Attic framing completed

Updates as of 4/15/03:

bullet

Elevator and Turret  framing installed

bullet

Attic framing installed

bullet

Turret and garage roof framing completed

bullet

Main level roof fascia installed

bullet

Roof sheeting installed

Updates as of 4/1/03:

bullet

Elevator and Turret steel arrive

bullet

Elevator and Turret steel installed

bullet

Garage deck headers and entryway framing installed

bullet

Garage deck subfloor installed

bullet

Garage ceiling joists installed

Update as of 3/15/03:

bullet

Upper Site main house main level wall framing installed

bullet

Upper Site main house upper level roof framing installed

Updates as of 3/1/03:

bullet

Upper Site main house upper level wall and roof framing

bullet

Upper Site main house public level plumbing, subfloor and initial wall framing 

bullet

Garage level steel framing installed

Updates as of 2/15/03:

bullet

Upper Site main house upper level plumbing, subfloor, and initial wall framing

Updates as of 2/1/03:

bullet

Lower site floorplan added

bullet

Driveway photos added

bullet

Upper Site main house construction photos added

Note: You May Click on Any Photo to See Enlarged View

artist rendering.jpg (361166 bytes)
Architect's Rendering of Main House on Upper Site

 front of house from turnaround area.jpg (913442 bytes)
Actual front of house with final stucco color coat, wrought iron, and tile  installed

      northview of house.jpg (690190 bytes)
Front of house with stucco color coat and tile installed- from North

southview of house.jpg (735694 bytes)
Back of house with stucco color coat  and rear deck tile installed- from South

     
 Top Portion of Concrete Driveway

Guest_House_and_Barn.jpg (335168 bytes)
Lower Site Guest House and Barn

 

For more information, please email bill@billkerns.com